Outage Simulation Test - Sanyo Denki SANUPS E11A102U-J Instruction Manual

E11a series 1kva, 2kva, 3kva 200v model hybrid ups type c
Hide thumbs Also See for SANUPS E11A102U-J:
Table of Contents

Advertisement

§
9
.
3
O
u
t
a
g
e
S
§
9
.
3
O
u
t
a
g
e
S
Perform a power outage test to confirm whether the UPS is working properly. Be sure to perform this test
prior to connecting the load devices.
① Set
MAIN MCCB on the back panel of the UPS to "ON".
Set to "ON".
② Press and hold
Hold for 1 second.
When the UPS is working properly, the buzzer sound and LED state will be as indicated in steps ③
and ④.
Set
MAIN MCCB to "OFF".
Set to "OFF".
i
m
u
l
a
t
i
o
n
T
e
s
t
i
m
u
l
a
t
i
o
n
T
e
s
t
for at least 1 second.
Preparation Before Operation
Step ① is not necessary if the
procedure in §9.2 "UPS Charge"
was performed beforehand.
LEDs
Green INPUT
Green INV.ON/STAND BY Off
Green OUTPUT
Green INPUT
Green INV.ON/STAND BY Off
Green OUTPUT
Check that the "Green INPUT"
stops blinking and remains lit, and
then proceed to step ②.
Buzzer
Musical trill
LEDs
Green INPUT
Lit
Green INV.ON/STAND BY
Lit
Green OUTPUT
Lit
Green DOUBLE CONVERSION Lit
After "Green DOUBLE CONVERSION"
lights, it might go off depending on the input
power condition.
Buzzer
2 beeps..., 2 beeps..., repeated
LEDs
Green INPUT
Green INV.ON/STAND BY Lit
Green OUTPUT
Tip
Blinking
Off
Lit
Off
Blinking
Lit
28