Procedure Until Load Device Operation - Sanyo Denki SANUPS E11A Series Instruction Manual

Hybrid, 1kva, 1.5kva, 2kva, 3kva, 100v
Hide thumbs Also See for SANUPS E11A Series:
Table of Contents

Advertisement

Procedure Outline to Operation
§
8
.
P
r
§
8
.
P
r
The procedure outline until turning on the load devices is as follows.
Be sure to follow the procedure outline below to backup the load devices during power outage.
When you do not change
the user setting, proceed
to next step.
When setting
the alarm buzzer does not sound.
21
o
c
e
d
u
r
e
U
n
o
c
e
d
u
r
e
U
Check the default value of the user setting
Charge the UPS
to "ON",
MAIN SW
Perform the power outage simulation test
Test result: OK
Connect the load devices
Start up the UPS
Turn on the load device power
The backup function is available during power outage.
t
i
l
L
o
a
d
D
n
t
i
l
L
o
a
d
D
⇒ page 22, 31, 32
When the default settings do not
configurate with your environment or
requirements, change the user settings.
Configure the user setting
⇒ page 23
When setting
MAIN SW
the alarm buzzer sounds.
⇒ page 24
Test result: NG
⇒ page 26
⇒ page 27
⇒ page 28
e
v
i
c
e
O
p
e
e
v
i
c
e
O
p
e
User Settings Guide
to "ON",
See §7.1 to connect the battery
connector.
⇒ page 18
See "If power outage simulation test
does not finish properly, check the
following points." to perform
countermeasure.
⇒ page 25
r
a
t
i
o
n
r
a
t
i
o
n

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents