Horizontal Installation - Sanyo Denki SANUPS E11A102U-J Instruction Manual

E11a series 1kva, 2kva, 3kva 200v model hybrid ups type c
Hide thumbs Also See for SANUPS E11A102U-J:
Table of Contents

Advertisement

Installation
§
6
.
3
H
o
r
§
6
.
3
H
o
r
CAUTION
When the UPS is horizontally installed, always place with the control panel on the right.
Do not place other objects on top of the UPS. Doing so can damage the UPS.
① Prepare the bushings supplied.
② Insert the supplied bushings into the holes on the left side and right side.
E
E
Four holes on the left side.
③ Place the UPS on installation location.
17
i
z
o
n
t
a
l
I
n
s
t
a
l
l
a
i
z
o
n
t
a
l
I
n
s
t
a
l
l
Do not sit, step or lean on the UPS, as bodily injury could result if the UPS was to fall.
The UPS weight is as shown in the table in §6. All work that involves lifting the UPS
should be carried out by at least 2 persons. For safety, put on protective shoes. Bodily
injury can result if the UPS falls. Be careful to avoid straining your lower back when
moving and installing the UPS.
Be careful not to get your hands caught when installing the stand.
1
1
1
1
A
A
1
1
0
0
2
2
,
,
2
2
0
0
2
2
Bushings
6
E
1
1
A
3
0
2
E
1
1
A
3
0
2
Bushings
8 holes on the left side.
This completes horizontal installation.
t
i
o
n
a
t
i
o
n
Control panel
14
Control panel
Two holes on the right side
6 holes on the right side

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents