Table Of Contents - Sanyo Denki SANUPS E11A102U-J Instruction Manual

E11a series 1kva, 2kva, 3kva 200v model hybrid ups type c
Hide thumbs Also See for SANUPS E11A102U-J:
Table of Contents

Advertisement

Thank you for choosing the SANUPS E11A.
SAVE THESE INSTRUCTIONS
This manual contains important instructions for E11A serise that should be followed during installation
and maintenance of the UPS*
customers. To use the UPS correctly and safely, read this manual before using the UPS. Please be sure to
User Settings Guide
also read the
handy for convenient reference.
This UPS is intended for installation in a temperature-controlled indoor environment free of conductive
contaminants.
・ Operating temperature: 0 to 40 ゚ C (32 to 104 ゚ F)
*
1
UPS is an abbreviation for Uninterruptible Power Supply.
§1. Before Use................................................................................................................................
§2. Safety Precautions...................................................................................................................
§3. For Proper Operation ..............................................................................................................
§3.1 UPS Input Power Supply...............................................................................................
§3.2 Installation Precautions ................................................................................................
§3.3 Usage Precautions .........................................................................................................
§4.Checking the Contents of the Package.....................................................................................
§5. External Dimensions and Part Names....................................................................................
§5.1 Front and Back Panels of UPS ......................................................................................
§5.2 Control Panel and Indicators.........................................................................................
§5.3 External Interfaces ........................................................................................................
§6. Installation ..............................................................................................................................
§6.1 Installation Environment Check ...................................................................................
§6.2 Installation Space Check ...............................................................................................
§6.3 Horizontal Installation .................................................................................................. 17
§6.4 Vertical Installation .......................................................................................................
§6.5 Rack Mounting .............................................................................................................
§7. Wiring ... ..................................................................................................................................
§7.1 Battery Connector Connection ......................................................................................
§7.2 Connecting Optional Equipment ...................................................................................
§7.3 Input Plug Connection................................................................................................... 23
§8. Procedure Until Load Device Operation .................................................................................
§9. Preparation Before Operation .................................................................................................
§9.1 User Setting Check ........................................................................................................ 26
§9.2 UPS Charge ...................................................................................................................
§9.3 Outage Simulation Test .................................................................................................
§10. Load Devices Connection.......................................................................................................
§11. Operating Procedures ............................................................................................................
§11.1 UPS Startup.................................................................................................................
§11.2 UPS Shutdown (Daily).................................................................................................
§11.3 UPS Shutdown (If Not to Be Used for More Than a Week) ........................................
*
2
Service technician
This term is used to indicate service technicians from SANYO DENKI or entrusted from SANYO DENKI
with knowledge of this UPS.
Maintenance work must not be performed by other than a qualified service technician.
Introduction
and batteries to protect the safety of the service technician*
1
for details about user setting menus. After reading, please keep these

Table of contents

and the
2
1
2
6
6
6
7
8
9
9
11
12
16
16
16
18
20
21
21
22
25
26
27
28
30
31
31
33
34

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents