Attach the stands to the UPS securely. Unless the UPS is secured solidly in place, it
can shift or fall during seismic events (earthquakes) or when it is subjected to shock or
vibration, possibly causing bodily injury.
The UPS weight is as shown in the table in §6. All work that involves lifting the UPS,
such as attaching the stand, should be carried out by at least 2 persons. For safety, put
CAUTION
on protective shoes. Bodily injury can result if the UPS falls. Be careful to avoid
straining your lower back when moving and installing the UPS.
Be careful not to get your hands caught when installing the stand.
When the UPS is vertically installed, attach two supplied stands.
Always place with the left side of the UPS on the bottom, and the control panel on the top.
E
E
1
1
1
1
A
A
1
1
0
0
2
2
,
,
2
2
0
0
2
2
① Prepare two stands, four screws, and two bushings supplied.
Stands 2
② Place the UPS on the table and then use screws to attach the stand to the holes on the left side.
③ Place the UPS with the stand on the bottom, and the control panel on the top.
④ Insert two bushings into the holes on the UPS.
② Attach two stands
with the screws.
I
n
s
t
a
l
l
a
t
i
o
n
I
n
s
t
a
l
l
a
t
i
o
n
Control panel
Screws for Stands
M4×8 4
Control panel
Bushings 2
④ Insert two bushings
into two holes.
Installation
18