Connecting Optional Equipment - Sanyo Denki SANUPS E11A102U-J Instruction Manual

E11a series 1kva, 2kva, 3kva 200v model hybrid ups type c
Hide thumbs Also See for SANUPS E11A102U-J:
Table of Contents

Advertisement

§
7
.
2
C
o
n
n
e
c
t
i
n
§
7
.
2
C
o
n
n
e
c
t
i
n
Before connecting optional equipment, disconnect the UPS input power plug
from the utility power outlet and make sure that the UPS is completely stopped.
CAUTION
Failure to do so can result in electric shock.
If you want to use a Network cable or optional equipment, connect them before operating the UPS.
If you need to connect them after operating the UPS, do so after completely stopping the UPS and
disconnecting the input power plug from the utility power outlet.
For details about wiring and settings, see the descriptions in §16. "How to Use Power Management
Software" and §18. "Using Optional Equipment" and the instruction manual supplied with the optional
equipment.
Contact your supplier or a Sanyo Denki representative for more information about optional equipment.
Connecting a Network cable and using the power management software (on supplied CD-ROM)
Using a LAN interface card
Using a contact interface card
"EXT.BATT" shape varies depending
on the battery model.
g
O
p
t
i
o
n
a
l
E
q
u
g
O
p
t
i
o
n
a
l
E
q
u
Connecting an outlet box and performing output line control ⇒
Connecting the Emergency Power Off
(EPO) terminals
Connecting a remote switch for remote operation ⇒
Using linked operation
Using expansion battery modules
The following expansion battery modules are available to extend
backup time. For more information, refer to the instruction
manual of the expansion battery module.
i
p
m
e
n
t
i
p
m
e
n
t
62
page
63
page
Note
The contact interface card and the LAN
interface card cannot be used simultaneously.
Battery modules
Type
UPS
20-minute backup
E11A102
Battery module
E11A202
E11A302
30-minute backup
Battery module
47 to 48
pages
58 to 61
pages
64
page
53
page
54 to 57
pages
Backup time
Modules
(Minutes)
connected
1
20
2
40
3
60
1
30
2
60
Wiring
22

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents