Horizontal Installation - Sanyo Denki SANUPS E11A Series Instruction Manual

Hybrid, 1kva, 1.5kva, 2kva, 3kva, 100v
Hide thumbs Also See for SANUPS E11A Series:
Table of Contents

Advertisement

§
6
.
3
H
o
r
i
z
o
n
t
a
§
6
.
3
H
o
r
i
z
o
n
t
a
Do not sit, step or lean on the UPS, as bodily injury could result if the UPS was to fall.
The UPS weight is as shown in the table in §6. All work that involves lifting the UPS
should be carried out by at least 2 persons. For safety, put on protective shoes. Bodily
injury can result if the UPS falls. Be careful to avoid straining your lower back when
CAUTION
moving and installing the UPS.
Be careful not to get your hands caught when installing the stand.
When the UPS is horizontally installed, always place with the control panel on the right.
Do not place other objects on top of the UPS. Doing so can damage the UPS.
① Prepare six bushings supplied.
② Insert the supplied bushings into the holes on the left side and right side.
E
E
1
1
1
1
A
A
1
1
0
0
2
2
,
,
Bushings
Four holes on the left side.
E
1
1
A
3
0
2
E
1
1
A
3
0
2
Six holes on the left side.
③ Place the UPS on installation location.
l
I
n
s
t
a
l
l
a
t
i
o
n
l
I
n
s
t
a
l
l
a
t
i
o
n
Control panel
1
1
5
5
2
2
,
,
2
2
0
0
2
2
6
Bushings
10
This completes horizontal installation.
Control panel
Two holes on the right side
Four holes on the right side
Installation
14

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents