Shutting Down The Server Node - Fujitsu PRIMERGY CX400 M4 Upgrade And Maintenance Manual

Hide thumbs Also See for PRIMERGY CX400 M4:
Table of Contents

Advertisement

Basic hardware procedures
4.2

Shutting down the server node

Safety notes
V
CAUTION!
For further safety information, please refer to chapter
information" on page
I
This step is only required when upgrading or replacing non-hot-plug
components.
Ê Inform the system administrator that the server node will be shut down and
put offline.
Ê Terminate all applications.
Ê Press the On/Off button either on the rear or on the corresponding front
panel to shut down the server node.
I
If the system is running an ACPI-compliant operating system,
pressing the On/Off button will perform a graceful shutdown.
40
25.
Upgrade and Maintenance Manual
"Important
CX400 M4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents