Agilent G1701EA MSD Productivity ChemStation Familiarization Guide
Press lightly on the metal box mounted on the MSD side
board until the air noise stops to ensure a correct seal.
Close the MSD analyzer top cover.
12
On the MSD local control panel:
13
Press Menu repeatedly until Maintenance appears.
a
Press Item repeatedly until Pumpdown appears.
b
Press Yes/Select to start the pumpdown.
c
The pumpdown is completely automatic and does not require
operator actions.
After the turbo pump starts and the ion gauge value reaches
100 mTorr, allow the MSD to operate for a minimum of 2 hours
before acquiring sample data.