Removing the server node dummy module

I
The CX400 M4 system must always run with closed node bays. It is only
allowed to leave a bay open for a limited time in case of repairing a server
node (for example). In the meantime all remaining server nodes run in
throttling mode (with reduced performance).
V
CAUTION!
Follow the safety instructions in the chapter
on page
Figure 9: Removing the server node dummy module
Ê Undo the locking mechanism (1) of the release lever and pull the server
node dummy module out of the slot (2).
CX400 M4
25.