Releasing the Inner Rail
To mount the rails onto the chassis, first release the inner rail from the outer rails.
Each inner rail has a locking latch that prevents the server from coming completely out of
the rack when when the chassis is pulled out for servicing.
1. Pull the inner rail out of the outer rail until it is fully extended.
2. Pull the thin plastic locking tab to release the inner rail.
3. Pull the inner rail all the way out.
Note: Keep track of which inner rail is left or right. The inner rails are not marked
Locking Tab
for Inner Rail
2
Inner Rail
1
Inner Rail
Removed
Figure 2-2. Extending and Releasing the Inner Rail
Chapter 2 Installation in a Rack
21
Right side Rail
Left side Rail