Danfoss VLT AQUA FC 200 Series Programming Manual page 201

Hide thumbs Also See for VLT AQUA FC 200 Series:
Table of Contents

Advertisement

®
VLT
AQUA Drive Programming Guide
[39]
Set digital out B high
[40]
Set digital out C high
[41]
Set digital out D high
[42]
Set digital out E high
[43]
Set digital out F high
[60]
Reset Counter A
[61]
Reset Counter B
[70]
Start Timer 3
[71]
Start Timer 4
[72]
Start Timer 5
[73]
Start Timer 6
[74]
Start Timer 7
23-04 Occurrence
Array [10]
Option:
[0] *
All days
[1]
Working days
[2]
Non-working days
[3]
Monday
[4]
Tuesday
[5]
Wednesday
[6]
Thursday
[7]
Friday
[8]
Saturday
[9]
Sunday
2.20.2 23-1* Maintenance
Wear and tear calls for periodic inspection and service of elements in the application, e.g. motor bearings, feedback sensors and seals or filters. With
Preventive Maintenance the service intervals may be programmed into the frequency converter. The frequency converter will give a message when
maintenance is required. 20 Preventive Maintenance Events can be programmed into the frequency converter. For each Event the following must be
specified:
Maintenance item (e.g. "Motor Bearings")
Maintenance action (e.g. "Replace")
Maintenance Time Base (e.g. "Running Hours" or a specific date and time)
Maintenance Time Interval or the date and time of next maintenance
NB!
To disable a Preventive Maintenance Event the associated par.23-12
Preventive Maintenance can be programmed from the LCP, but use of the PC-based VLT Motion Control Tool MCT10 is recommended.
Function:
Select which day(s) the Timed Action applies to. Specify working/non-working days in par.
0-81
Working Days
, par.0-82
Additional Working Days
®
MG.20.O4.02 - VLT
is a registered Danfoss trademark
2 Parameter Description
and par.0-83
Additional Non-Working Days
Maintenance Time Base
must be set to
2
.
Disabled
[0].
201

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the VLT AQUA FC 200 Series and is the answer not in the manual?

Questions and answers

Table of Contents