Installation; Siting Requirements - ABB AX410 User Manual

Single and dual input analyzers for low level conductivity
Hide thumbs Also See for AX410:
Table of Contents

Advertisement

Single and Dual Input Analyzers for Low Level Conductivity
AX410, AX411, AX413, AX416, AX418, AX450, AX455 & AX456

6 INSTALLATION

6.1 Siting Requirements

Note.
Mount in a location free from excessive vibration.
Mount away from harmful vapours and/or dripping
fluids.
Where possible, mount the analyzer at eye level to
allow an unrestricted view of the front panel displays
and controls.
Maximum Distance
 50m (137.5 ft) –
cell constant <0.1
cell constant ≥0.1
A – Maximum Distance Between Analyzer and Sensor
–20°C
(–4°F)
B – Within Temperature Limits
NEMA 4X
C – Within Environmental Limits
Fig. 6.1 Siting Requirements
50
Conductivity
Sensor
100m (275 ft) –
65°C
(149°F)
Max.
Min.
IP66
6 INSTALLATION
IM/AX4CO
Issue 11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ax411Ax413Ax416Ax418Ax456Ax450 ... Show all

Table of Contents