9 APPLICATION OF SETTINGS
The minimum operate time of stage 1 will be set to 0.25 seconds, the maximum operating time will be 10 minutes, and the
reset time will be set to 4 minutes.
Stage 2 is typically set lower than stage 1 with a time delay to prevent nuisance alarms for external faults that are normally
cleared by system protection. For the application example, the pickup setting is:
Source 2 will be chosen for this element. The settings are as follows:
For the example system, we have the following values:
Z
(
)
b sec
CENTER 1
CENTER 2
The voltage supervision setting will be determined by a system study and may be disabled on either element if required. VT
fuse failure should supervise this element.
GE Multilin
Pickup
70% I
×
capability
=
2
2
base kV
CT ratio
-------------------------- -
×
-------------------- -
----------------------------------- -
=
=
base MVA
VT ratio
211.765 MVA
X
'(sec)
X
' Z
×
(sec)
0.216 15.54 Ω
=
=
d
d
b
(
)
×
(
)
X
sec
X
Z
sec
1.967
=
=
d
d
b
(
)
'(sec)
Z
sec
X
+
b
d
------------------------------------------------ -
=
2
Z
(
sec
)
b
--------------------
RADIUS 1
=
=
2
PICKUP DELAY 1
(
)
'(sec)
X
sec
X
+
d
d
-------------------------------------------------
=
2
(
)
X
sec
d
RADIUS 2
-------------------- -
=
=
2
G30 Generator Protection System
0.70
×
8%
5.6%
=
=
2
(
18 kV
)
1600
×
-------------- -
15.54 Ω
=
157.5
×
3.36 Ω
=
×
15.54 Ω
30.57 Ω
=
15.54Ω
3.36Ω
+
------------------------------------------ -
9.45 Ω
=
=
2
15.54 Ω
--------------------- -
7.77 Ω
=
2
0.06 seconds
=
30.57Ω
3.36Ω
+
------------------------------------------ -
16.97 Ω
=
=
2
30.57 Ω
--------------------- -
15.28 Ω
=
2
9.1 SETTING EXAMPLE
(EQ 9.6)

9.1.6 LOSS OF EXCITATION

(EQ 9.7)
(EQ 9.8)
(EQ 9.9)
(EQ 9.10)
(EQ 9.11)
(EQ 9.12)
(EQ 9.13)
(EQ 9.14)
9-7