9.1 SETTING EXAMPLE
Enter the following values through EnerVista UR Setup (or alternately, through the front panel

AC INPUTS
VOLTAGE BANK F5
Frequency tracking should always be enabled for generator applications. Make the following power system parameters
changes via EnerVista UR Setup or through the
menu:
Two sources are required for this application example. The "LINE" source uses the phase and auxiliary VT inputs and the
CT input wired to the generator output CT. The "GEN" source uses the phase VT inputs and the CT input wired to the gen-
erator neutral CT. Including the phase VT inputs for both sources allows the user to choose the location of elements that
use both voltage and current. Elements using the auxiliary VT input are assigned to the "GEN" source.
Make the following changes through EnerVista UR Setup or through the
the

SETTINGS
SYSTEM SETUP
9
Stage 1 of the generator unbalance element is typically used to trip the generator. In this example, the I
machine is 8% and the I
9-6
menu):
SETTINGS

menus:
SOURCE 2
2
T capability is 10. The generator nominal current is:
2
I
primary
nom
-------------------------------- -
I
=
(
)
nom pu
CT primary
G30 Generator Protection System
9 APPLICATION OF SETTINGS


SYSTEM SETUP

POWER SYSTEM


SETTINGS

9.1.5 GENERATOR UNBALANCE

6800 A
------------------ -
0.85 pu
=
=
8000 A

SETTINGS
SYSTEM SETUP
9.1.3 POWER SYSTEM

VOLTAGE BANK F5

9.1.4 SIGNAL SOURCES


SYSTEM SETUP
SOURCE 1
capability of the
2
(EQ 9.5)
GE Multilin