Retard Contactors Operation Check; Ground Fault Sensing Check; Ground Fault In Retard Operation Check - Komatsu 830E Shop Manual

Dump truck
Hide thumbs Also See for 830E:
Table of Contents

Advertisement

1.5 Retard Contactors Operation Check

1. Put Selector Switch in FORWARD and depress retard pedal.
FORIN RS
2. Verify that the contactors pick up in the following sequence; RP1, RP2, MF, GF, and GFR then
RP3, RP4, RP5 (and RP6, RP7, RP8, and RP9 if used).
RP1 RP2 MF GF GFR RP3 RP4 RP5 RP6 RP7 RP8 RP9
a. Verify the feedback signals:
RP1 FB RP2FB MFFB GFFB GFRFB RP3FB RP4FB RP5FB
RP6FB RP7FB RP8FB RP9FB
3. MF, GF, and GFR must pick up after RP1 and RP2 but timing is very close. If installed, the
Dynamic Retard Light in the cab should illuminate.
4. Release retard pedal. Verify GF, GFR, and MF, RP3, RP4, RP5, (and RP6, RP7, RP8, and RP9
if used) drop out first, then after a one second delay RP1 and RP2 also drop out, and Dynamic
Retard Light (if installed) turns Off.

1.6 Ground Fault Sensing Check

1. Place Selector Switch in FORWARD and depress throttle.
2. Propulsion contactors MF, P1/(P2), GF, and GFR should pick up.
AS MF P1 (P2) GF GFR
a. Verify feedback signals are present:
MFFB P1FB (P2FB) GFFB GFRFB
3. Momentarily jumper from circuit 71 to terminal "A" on GFIP.
GFAULT
4. All contactors should drop out immediately and remain open, and Electric System Fault light (in
cab) should illuminate and remain On, even after circuit 71 to terminal "A" jumper is removed.
Event code 01 should appear on two digit display.
5. An analog value indicating current flow to ground should appear on PTU screen under
GFAULT.
6. Release throttle. Operate Override pushbutton on console to reset ground fault (Electric System
Fault) light. Press reset button on two digit display to clear event code.

1.7 Ground Fault in Retard Operation Check

1. Put Selector Switch in FORWARD and depress retard pedal.
FORIN RS
a. Verify feedback signal is present:
FORFB
2. Retard contactors RP1, RP2, MF, GF, and GFR, RP3-RP5, (and RP6-RP9 if used) should ener-
gize.
RP1 RP2 MF GF GFR RP3 RP4 RP5 RP6 RP7 RP8 RP9
E03012 2/02
Statex III Electrical Checkout Procedure
E3-13