Removing the upper bracket and lower bracket
8
LS
18
19
LS
15
Order
13
Rubber washer
14
Lower ring nut
15
Lower bracket
16
Bearing cover
17
Upper bearing
18
Lower bearing
19
Lower bearing dust seal
5
1
2
16 Nm (1.6 m
Job/Parts to remove
9
95 Nm (9.5 m
10
11
7
12
13
14
16
3
7 Nm (0.7 m
4
7 Nm (0.7 m
kgf, 12 ft
Ibf)
•
•
Q'ty
1
1
1
1
1
1
1
4-71
STEERING HEAD
kgf, 69 ft
Ibf)
•
•
6
7 Nm (0.7 m
kgf, 5.1 ft
•
1st 48 Nm (4.8 m
kgf, 35 ft
•
2nd 18 Nm (1.8 m
kgf, 13 ft
•
LS
17
kgf, 5.1 ft
Ibf)
•
•
kgf, 5.1 ft
Ibf)
•
•
Remarks
Ibf)
•
Ibf)
•
Ibf)
•