Start Up
After Pointek CLS200 is properly mounted and the switch bank is set up, apply power to
the unit. The green LED (L3) glows, indicating the unit is powered and operational.
Setpoint Adjustment
switches
P1
1
2
3
4
5
delay
L1
sensor
L2
status
output
(yellow)
status
(red)
Use the potentiometers P1 and P2 to adjust the alarm setpoints. Follow the setup
procedure for the application that most closely describes your operation:
Application
General
Demanding
Interface
detection
1.
When S3 is set to ON, it inverts the relay function, and the functioning of S1 and S2.
7ML19985AR02
Pointek CLS 200 (analog) – INSTRUCTION MANUAL
1
.
P2
trip
point
2
3
1
L3
power
(green)
Material
• dry solids
• low viscosity liquids
• hygroscopic / wet solids
• high viscosity and high
conductivity liquids
• liquid A / liquid B
• foam / liquid
1 2 3 4 5
Switches shown in OFF position.
Setup conditions
sensor uncovered;
min. 100 mm (4") free space all around
sensor immersed then uncovered; but
retaining max. possible material buildup
immerse sensor in whichever material
has lowest dielectric constant
1
delay: alarm activation
delay: alarm deactivation
1
failsafe/alarm
test delay settings
sensitivity (High or
Low gain)
S5
ON
(high)
OFF
(low)
OFF
(low)
Page I – 23