To Prepare The Vi For A Closed System Leak Check - Agilent Technologies 7890 Series Troubleshooting Manual

Gas chromatograph
Hide thumbs Also See for 7890 Series:
Table of Contents

Advertisement

7
Checking for Leaks

To Prepare the VI for a Closed System Leak Check

WA RNING
170
To leak check the interface independently of the gas sampling
device, you must disconnect the sampler from the interface to
isolate the interface flow system from the sampler.
Be careful! The oven and/or inlet may be hot enough to cause
burns. If either is hot, wear heat-resistant gloves to protect your
hands.
1
Gather the following:
1/16-inch nut for transfer line
Ferrule for transfer line
Heat-resistant gloves (if the inlet is hot)
2
Disconnect the transfer line from the interface.
3
Disconnect the carrier line from the sampler.
4
Prepare the end of the carrier line using a 1/16-inch male nut
and ferrule.
5
Connect the carrier line to the interface where you removed
the transfer line and tighten the nut finger tight. Tighten an
additional 1/4 to 1/2 turn with the 1/4-inch wrench.
6
Return to
"To Perform a VI Pressure Decay Test"
steps
9
to 16.
and repeat
Agilent 7890 Series Troubleshooting

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

7890a

Table of Contents