Verify Site Preparation; Prepare The Gc And Data System - Agilent Technologies 7697A Installation And Startup Manual

Headspace sampler
Hide thumbs Also See for 7697A:
Table of Contents

Advertisement

1
Installation
Table 2
Parts supplied with the headspace sampler (continued)
Description
Cap, 1/16-in., stainless steel
Nut and ferrule set, 1/8-in. Swagelok,
stainless steel
Nut, stainless steel, for 1/16-in. tubing
Ferrule set, stainless steel, for 1/16-in. tubing 0100-1490
Septum retainer nut for transfer line
Liner, Direct Connect, 2 mm ID, deactivated
O-Ring, 2-010, Fluoroelastomer, 10/pk
Septa, 11 mm low bleed, 5/pk

Verify site preparation

Prepare the GC and data system

8
Part number
Quantity Use
0100-0050
1
5181-7482
1
0100-0053
1
1
G3452-60835
1
5181-8818
1
5188-5365
1
5182-3413
1
Verify that the site has been prepared according to the site
preparation manual. Sufficient bench space, power supply
receptacles, supplies, gases, traps, required accessories, and
so forth must be available.
If not already installed, install the gas chromatograph and
verify its performance before beginning HS installation.
• Install the GC.
• Install the data system.
• Verify GC and data system performance.
• Cool all heated zones in the GC to safe handling
temperatures, especially the column oven and the inlet.
HS installation requires carrier gas flow interruption,
which can damage a hot column. HS installation requires
contact with the GC inlet, which can be hot enough to
cause burns.
• If you purchased the add- on HS control software, install
it after installing the data system.
Cap the cut end of the SSL or MMI inlet
carrier tubing.
Connect the 1/8-in. end of the post-drawn
tubing to the HS.
Cap the cut end of the SSL or MMI inlet
carrier tubing.
Support transfer line on GC SSL or MMI inlet
GC SSL or MM inlet liner for checkout.
GC SSL or MM inlet liner O-ring.
GC SSL or MM inlet septum (for checkout).
Installation and First Startup