Step 4: Turning On The Postbase; Step 5: Installing The Postbase - FP postbase Operator's Manual And Parts List

Mailing system with dynamic scale
Hide thumbs Also See for postbase:
Table of Contents

Advertisement

18
PostBase mailing system with Dynamic Scale
Step 4:
Turning on the PostBase
Step 5:
Installing the PostBase
• Press the PostBase button.
After turning on, the button lights up blue.
The PostBase initially performs a self-test.
The display lighting subsequently switches
on and the installation procedure starts.
The PostBase will guide you step-by-step
through the installation procedure. Simply
follow the instructions on the display.
The chapter "The basics of operation" in the
First Steps operator manual, which you
received together with the franking machine,
contains basic information on the use of the
display touch function and the operation.
Caution! During the course of installation,
the PostBase may start up multiple times. Do
not disconnect the PostBase from the power
supply!
Language
• Press the button with the desired
language.
• Confirm with the C
resume the installation procedure.
button and
ONTINUE

Advertisement

Table of Contents
loading

Table of Contents