Installation And Commissioning; Step 1: Unpacking And Checking The Contents Of The Package - FP postbase Operator's Manual And Parts List

Mailing system with dynamic scale
Hide thumbs Also See for postbase:
Table of Contents

Advertisement

3

Installation and commissioning

Caution! Carry out the steps for commissioning the PostBase mailing system
with Dynamic Scale in precisely the given order. Only in this way it is possible
to ensure the successful commissioning of your mailing system.
In order to retrofit the Feeder plus and Dynamic Scale to a PostBase
mailing system that is already in operation, follow the procedure for first
commissioning as closely as possible. First commissioning of the franking
machine (steps 2 to 5) are unnecessary in this case.
Before retrofitting, run through the R
In this way you can be sure that your PostBase franking machine is operating
with the latest machine software, and that it will recognise the new compo-
nents without difficulty.
In case of questions, please contact the Francotyp-Postalia Customer
Support.
Step 1:
Unpacking and checking the contents of the package
Installation and commissioning
S
EMOTE
ERVICES
Warning! Do not start operating the
PostBase mailing system if parts are
damaged or missing. Please contact the
Francotyp-Postalia Customer Support.
• Unpack all packages.
• Check that the contents of the packages
are complete and free from any damage.
(For scope of supply see page 14).
Keep the packing. Use it again if you need to
transport the mailing system or send it in to
the Customer Support.
menu function.
13

Advertisement

Table of Contents
loading

Table of Contents