FP postbase Operator's Manual And Parts List page 28

Mailing system with dynamic scale
Hide thumbs Also See for postbase:
Table of Contents

Advertisement

28
PostBase mailing system with Dynamic Scale
• Unscrew sealant tank cover.
• Fill the sealant tank with 'sealit' sealing
liquid.
• Place sealant tank screw cover and
tighten.
• Turn sealant tank upside down in a non-
dangerous area (e.g. over a sink) to check
if the cover is well sealed.

Advertisement

Table of Contents
loading

Table of Contents