Step 2: Assembling The Postbase - FP postbase Operator's Manual And Parts List

Mailing system with dynamic scale
Hide thumbs Also See for postbase:
Table of Contents

Advertisement

Step 2:
Assembling the PostBase
Installation site
The location of the PostBase mailing system
with Dynamic Scale must fulfil the following
requirements:
– Firm, level, low vibration and horizontal
base, which offers sufficient space for the
complete mailing system.
We recommend installation on a table or
base unit with a tabletop surface at least
2.0 m × 0.80 m (80" × 20").
– Room temperature within a range of
15 °C to 35 °C (59 °F to 95 °F).
– No direct sunlight.
– Relative humidity within a range of 15 % to
80 %, non-condensing.
– Power socket in the immediate vicinity.
– Network connection with internet access.
• Place the PostBase franking machine on a
suitable surface.
Installation and commissioning
15

Advertisement

Table of Contents
loading

Table of Contents