optimail Installation Guide
Commissioning overview
The following overview lists the operating steps for using your optimail for the first
time. You have to perform these steps in the given order before you can use the
optimail. If certain steps are inapplicable for installation and commissioning of your
optimail (e.g. because you have not ordered a sealer) simply proceed with the next
one. All steps are described in detail on the following pages.
Step 1:
Unpacking
Step 2:
Checking the contents of the package
Step 3:
Installing the optimail
Step 4:
Installing the ribbon cassette
Mounting the scale platform (optional)
Step 5:
Installing the catch tray (optional)
Step 6:
Installing the sealer (optional)
Step 7:
Step 8:
Connecting the optimail
Step 9:
Turning on
Step 10: Authorization
Step 11: Loading postage / TELESET