Cp Card Showing Ejectors - IBM totalstorage 2109 M12 Installation And Service Manual

San switch
Hide thumbs Also See for totalstorage 2109 M12:
Table of Contents

Advertisement

Link Speed LED
Figure 36. CP card showing ejectors
Perform the following steps to remove a filler panel:
1. Push in the yellow tab on each ejector. See Figure 37 on page 69.
2. Lever both ejectors all the way open.
3. Slide the filler panel out of the chassis.
68
IBM TotalStorage SAN Switch: 2109 Model M12 Installation and Service Guide
v Modem cable from the modem serial port
v Serial cable from the terminal serial port
v Ethernet cable from the Ethernet port
b. Notify the switch of a hot-swap request by pushing the yellow tab on each
ejector and clicking the black handles until they are slightly open. See
Figure 36. Wait for the status LED to turn off.
Attention:
If you are removing a CP card, wait for the status LED to turn
off in response to the hot-swap request before you uninstall the card.
c. Lever both ejectors all the way open, and slide the CP card out of the
chassis.
CP Card
Power LED
!
CP Card
Status LED
Link Status LED
10/100 Mb/s
Ejector (2x)
Direction to Push
Yellow Ejector Button
RS-232 Modem Port
10101 Console Port
Ethernet Port
Direction to Push
Yellow Ejector Button
SJ000638

Advertisement

Table of Contents
loading

Table of Contents