Unpacking the M12

Perform the following steps to unpack the M12.
Note: This procedure requires a 1/2 in. socket wrench to remove the pallet bolts.
1. Remove the upper portion of the packing crate while the switch is still in the
2. Open the shipping crate by pulling the handle of the latch and turning it
3. Remove the packing foam, antistatic plastic, 14U chassis mount kit, and
4. Unscrew the four bolts that hold the Model M12 to the pallet. See Figure 20.
Figure 20. 2109 Model M12 on a pallet
5. Remove the chassis door from the chassis.
42
IBM TotalStorage SAN Switch: 2109 Model M12 Installation and Service Guide
shipping area to reduce clutter at the installation site.
a. Open the latches that hold the top of the crate to the pallet. To open a latch,
pull the handle out, turn it to the left, then slide the latch open.
b. Lift the top of the crate off the pallet.
c. Leave the foam on top of the chassis to hold the kits in place during
transportation to the installation area.
d. Do not move the chassis off the pallet until the door is removed.
counterclockwise. Slide the latch open.
accessory kit.
Remove the brackets.
Attention:
Remove the chassis door before you move the chassis.
a. Open the door 90°.
Pallet Bolt
(2 of 4 shown)
SJ000660