Heavy Load Label - IBM totalstorage 2109 M12 Installation And Service Manual

San switch
Hide thumbs Also See for totalstorage 2109 M12:
Table of Contents

Advertisement

Figure 3. Power supply cover caution label
4. Verify that the fusing caution label shown in Figure 4 is installed on the Model
Figure 4. Fusing caution label
5. Verify that the heavy load label shown in Figure 5 is installed on the back of the
Figure 5. Heavy load label
6. Verify that the SFP labels shown in Figure 6 on page xvii and Figure 7 on page
xvi
IBM TotalStorage SAN Switch: 2109 Model M12 Installation and Service Guide
>240 V~
M12 power supply.
CAUTION:
DOUBLE POLE /
L
NEUTRAL FUSING
F1
N
F2
switch.
>98 kg (215 lb)
xvii are installed on all SFP transceivers.
Note: The following SFP illustrations may differ from the SFPs included or
installed with your particular switch, depending upon the SFP
manufacturer. The labels shown below may vary by manufacturer.
SJ000323
SJ000324
PN 18P5002
SJ000625

Advertisement

Table of Contents
loading

Table of Contents