3. Rotate the front of the tray down, then lift the back to disengage the tabs on the
Figure 42. Cable management tray
Replacing a cable management tray
Perform the following steps to replace the cable management tray:
1. Orient the tray. See Figure 43 on page 81.
2. Insert the two tabs on the underside of the tray into the two slots at the bottom
3. Position and tighten the two screws that you previously removed.
4. Arrange the cables through or along the tray as required.
80
IBM TotalStorage SAN Switch: 2109 Model M12 Installation and Service Guide
back of the tray from the chassis.
Screw Hole
of the ac panel. Rotate the front of the tray up until it locks into place.
Note: Route the power cables out each side of the chassis.
Front of Cable
Management Tray
SJ000646