IBM totalstorage 2109 M12 Installation And Service Manual page 153

San switch
Hide thumbs Also See for totalstorage 2109 M12:
Table of Contents

Advertisement

running a POST 30
S
safety
certification label xv
electrical 57
environmental notices xi
guidelines
2109 Model M12 39
inspection, how to conduct xiv
label check xv
laser xxi
notices xi, 57
product disposal xxiv
Safety Information
Rack Safety xxii
safety inspection
external machine checks xiv
internal machine checks xiv
safety label checks xv
servicing the switch 57
setting up a remote modem system 34
SFP module
label xvi, xviii
software
features
Advanced Security 2
Advanced Zoning 2
Extended Fabrics 2
Fabric Manager 2
Fabric Watch 2
ISL Trunking 2
Performance Monitoring 2
Remote Switch 2
Web Tools 2
getting updates xxvi
specifications
16-port card 86
battery 87
facility 89
fibre-channel port 88
general 90
memory 86
modem serial port 88
POST 93
power 89
regulatory 92
restarting 93
terminal serial port 87
SPF, inserting 12
standard shipment items 41
starting and configuring the 2109 Model M12 7
switch
components 15, 85
configuring 7, 9
managing 4
operating 15
ports 85
POST, interpreting 30
providing initial power 7
switch (continued)
restarting 30
service 57
specifications
facility 89
general 90
memory 86
modem serial port 88
power 89
regulatory 92
terminal serial port 87
turning on and off 15
worksheets
planning 97
port configuration 98
zone configuration 100
zone definition 99
system
fire suppression xxiv
T
take-back program, product xxiv
terminal
serial port specifications 87
terminators for optical ports xxi
tests, diagnostic 31
tie wraps 20
tilt warning label, inspecting xviii
time required to install the 2109 Model M12 in the
cabinet 43
time required to remove and replace
16–port card or filler panel 59
blower assembly 78
cable management tray 79
CP card or filler panel 64
power supply or filler panel 75
tools required to install the 2109 Model M12 in the
cabinet 43
trademarks 102
turning on and off the 2109 Model M12 15
U
United States ordering procedure for the lift tool and the
24-inch load plate 40
units , field replaceable 31
unpacking the 2109 Model M12 42
updates, getting software xxvi
usage restrictions xxi
using the lift tool, the 24–inch load plate, and the bridge
tool 48
V
verifying
if the WWN card needs replacing 81
modem installation 36
the operation of the new CP card 70
voltage level at power source xviii
123
Index

Advertisement

Table of Contents
loading

Table of Contents