IBM totalstorage 2109 M12 Installation And Service Manual page 152

San switch
Hide thumbs Also See for totalstorage 2109 M12:
Table of Contents

Advertisement

N
non-IBM alteration attachment survey form xiv
notice, edition ii
notices
caution, battery xxiv
IBM 101
safety 57
safety and environmental xi
O
operating the 2109 Model M12 15
optical port terminators xxi
ordering the lift tool and the 24–inch load plate 40
out-of-band management method 4
overview of the 2109 Model M12 1
P
parameters
configuration 9
modem for Windows 95, 98, 2000, ME or NT, or
TERM in a UNIX environment 34
part number
24-inch load plate 40
lift tool 40
parts
2109 Model M12 95
information 95
patents 101
PDU
power-off procedure 59
physical dimensions 85
pinch point label, inspecting xviii
pinouts
modem serial port 88
terminal serial port 87
planning worksheet 97
port
configuration worksheet 98
Ethernet 17
modem serial 16
side of chassis 2
switch 85
terminal serial 17
terminal serial, specifications 87
POST
interpreting 30
restarting 93
specifications 93
power
removing xiv
specifications 89
to the switch 7
power distribution unit (PDU)
power-off procedure 59
power supply
cover caution label xv
description 17
LEDs 26
122
IBM TotalStorage SAN Switch: 2109 Model M12 Installation and Service Guide
power supply (continued)
removing 75
replacing 77
turning on and off 15
power-off procedure
PDU 59
product
disposal xxiv
recycling xxiv
specifications 85
proper grounding xviii
providing initial power to the switch 7
R
R009, Non-IBM Alteration Attachment Survey form xiv
reader comment form processing xxvii
recommendations for managing cables 63
recording critical switch information 65
recycling products xxiv
reference information for the fruinfoset command 82
regulatory specifications 92
related documents xxv
remote modem setup 34
Remote Switch 2
removing
16–port card 59
16–port card filler panel 59
2109 Model M12 from the cabinet 53
ac power xiv
blower assembly 78
cable management tray 79
chassis door 42
CP card 67
filler panel 67, 75
power supply or filler panel 75
removing and replacing
16–port card 59
16–port card filler panel 59
blower assembly 77
cable management tray 79
CP card or filler panel 64
power supply or filler panel 75
WWN card 81
replacing
16–port card 62
16–port card filler panel 62
blower assembly 78
cable management tray 80
CP card battery 74
CP card or filler panel 69
filler panel 69, 77
power supply or filler panel 77
required items
to configure and connect the 2109 Model M12 8
to remove a blower assembly 78
to remove a cable management tray 79
to remove a CP card or filler panel 64
requirements, environmental 90
restarting the switch 93
restrictions, usage xxi

Advertisement

Table of Contents
loading

Table of Contents