IBM totalstorage 2109 M12 Installation And Service Manual page 75

San switch
Hide thumbs Also See for totalstorage 2109 M12:
Table of Contents

Advertisement

Shelf Bracket (2x),
Notched End
Figure 23. Shelf brackets are installed on the rails (cabinet walls are not shown)
3. Tighten the adjusting screws on the shelf brackets.
4. Attach four 10–32 clip nuts to the two rails at the front of the cabinet (service
aisle side). See Figure 24 on page 46.
Note: If you are installing an M12 into the bottom of the rack, go to step 4a for
the location of the clip. If you are installing an M12 into the top of the
rack, go to step 4b for the location of the clip.
a. Attach the lower clip nuts to the top of EIA unit 6. Attach the upper
clip nuts to the middle of EIA unit 17.
b. Attach the lower clip nuts to the top of EIA unit 23. Attach the upper
clip nuts to the middle of EIA unit 34.
Adjusting Screws
Chapter 5. Installing and removing Model M12 switches
SJ000663
45