Figure 38. Alignment guides in the card slots
Perform the following steps to replace a CP card or filler panel:
1. Orient the CP card or filler panel so that the ejectors are at the front of the
2. Align the flat-metal side of the CP card or filler panel inside the upper and lower
3. Close the ejectors by pressing in the black handles toward the CP card or filler
Perform these additional steps if you are installing a new CP card:
1. Verify that the power LED on the CP card displays a steady green light. It might
2. Connect the cables as required to the CP card.

Verifying the operation of the new CP card

Perform the following steps to verify that the new CP card is operational:
70
IBM TotalStorage SAN Switch: 2109 Model M12 Installation and Service Guide
!
chassis and the metal pan is on the left.
rail guides in the slot. See Figure 38. Slide the CP card or filler panel into the
slot until it is firmly seated.
panel, until the ejectors lock. You will hear a slight audible click. The levering
action of the handles seats the CP card or filler panel in the chassis.
require a few seconds to turn on. If it does not turn on, ensure that the CP card
has power and is firmly seated. The front of the CP card should be flush with
the adjacent cards or filler panels.
Note: The LED patterns can temporarily change during a POST and other
diagnostic tests.
Attention:
Do not route the cables in front of the exhaust vent (located at the
top of the port side of the chassis).
v Modem cable to the modem serial port
v Serial cable to the terminal serial port
v Ethernet cable to the Ethernet port
1. Verify that startup and POST are complete on the new CP card (a minimum of
3 minutes), and that the CP cards have achieved failover redundancy.
a. Wait until the Status LEDs on both CP cards are not lit.
If Fabric OS v4.0.2 or later firmware is installed on both CP cards, the
Status LED for the active CP card displays orange until the active CP card
is fully operational. The Status LED for the standby CP card displays
orange until the CP cards have achieved failover redundancy.
b. From the serial console for the active CP card (the CP card that was not
replaced), run the hashow command and verify that the command output
includes HA Enabled Heartbeat Up.