Figure 28. Locking the shelf into position
12. For the upper M12, install the bridge tool by completing the following steps:
50
IBM TotalStorage SAN Switch: 2109 Model M12 Installation and Service Guide
Note: You might want to tilt the bridge tool towards the back of the
cabinet approximately 45° to make it easier to align the two-pin
and one-pin sections with the vertical support.
c. Align the two-pin section of the support on the back of the vertical rail with
the bottom and middle holes in EIA unit 3.
d. Align the one-pin section of the support on the front of the vertical rail with
the middle hole in EIA unit 1.
Note: You might want to tilt the bridge tool towards the back of the cabinet
approximately 45° to make it easier to align the two-pin and the
one-pin sections with the vertical support.
e. Lock the shelf into position. See Figure 28.
a. Remove the bridge tool from the box and adjust the two supports 45°.
b. Hold the bridge tool between the two vertical supports near EIA unit 20,
and move the two supports another 45°. Make sure that the following
conditions are met:
v The two-pin section of the support is on the back of the vertical support.
v The one-pin section is on the front of the vertical support.
Note: You might want to tilt the bridge tool towards the back of the
cabinet approximately 45° to make it easier to align the two-pin
and one-pin sections with the vertical support.
c. Align the two-pin section of the support on the front of the vertical rail with
the bottom hole and the middle hole in EIA unit 20.
SJ000680