Configuring; Configuring Et 200Eco Pn - Siemens SIMATIC ET 200eco PN Operating Instructions Manual

Distributed i/o
Hide thumbs Also See for SIMATIC ET 200eco PN:
Table of Contents

Advertisement

Configuring

4.1

Configuring ET 200eco PN

Requirements
You need STEP 7 as of version V5.4, SP4 and possibly HSP.
Introduction
ET 200eco PN is included in the hardware catalog of
Procedure
1. Start SIMATIC Manager.
2. Create a new project.
3. Configure the ET 200eco PN with
4. Double-click on the technology module at slot 1 of the ET 200eco PN in the configuration
table and set the parameters.
5. Save the configuration, or download it to the IO Controller.
Prerequisite for the GSD file
You will need a GSD file, available for download from the Internet
(http://support.automation.siemens.com/WW/view/en/19698639/133100).
ET 200eco PN family:
gsdml-v2.2-siemens-et200eco"date format yyyymmdd".xml
Configuring ET 200eco PN on PROFINET IO using STEP 7
1. Start STEP 7 and call up the Options > Install New GSD File menu command in
HW Config
2. In the next dialog box, select the GSD file to install, and confirm with "OK". Result:
ET 200eco PN is displayed in the hardware catalog, PROFINET IO folder.
3. The rest of the procedure is as described in the Programming with STEP 7
(http://support.automation.siemens.com/WW/view/en/18652056) manual.
See also
For further information, refer to the STEP 7 online help.
ET 200eco PN
Operating Instructions, 08/2016, A5E01250250-AJ
.
HW Config
HW Config
.
4
after the start of STEP 7.
67

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents