Connecting the power cords to the hardware

Connect compute node slot 4, port 1 to Primary Shelf canister A, FC Ch2
3
Verify that the connections match the ports in the following diagram.
Compute node
Primary Storage Shelf
A
B
The compute node and the Primary Storage Shelf each contain two AC power
supplies. To ensure power redundancy, connect the power supplies on each
component to different AC power sources.
Typically, the rear of a rack is configured with a Power Distribution Unit (PDU) on
each side. The PDU on each side is from a different source to provide power
redundancy.
Caution: Do not turn on the power to any components while connecting the power
cords. The components must be turned on in a specific sequence to ensure correct
communication.
Connecting the power cords to the hardware
Installation procedures
43