Installing The Sfps Into The Fibre Channel (Fc) Ports - VERITAS Velocity 7330 Hardware Installation Manual

Hide thumbs Also See for Velocity 7330:
Table of Contents

Advertisement

Installing the SFPs into the Fibre Channel (FC)
ports
11
Insert the two rear standoff pegs that extend from the side of the compute node
into the last rail slots.
12
Lower the front of the compute node into the rail slots at the front of the rail
extenders. A peg in the middle and a peg at the front of the compute node fit
into the rail slots.
13
Lift up on the rail release buttons and slide the compute node completely into
the rack.
14
Secure the compute node to the rack on each side by tightening the thumbscrew
on the front.
Four small form-factor pluggable (SFP) transceivers are provided. You must insert
them into the four Fibre Channel (FC) ports in slots 1 and 4 in the compute node
rear panel.

Installing the SFPs into the Fibre Channel (FC) ports

Installation procedures
39