ESAB 100i Instruction Manual page 53

Plasma systems
Hide thumbs Also See for 100i:
Table of Contents

Advertisement

2. Carefully remove the cover from the module noting the attached wire harness that connects to J1. Remove the wire har-
ness and then set the cover to the side.
3. Attach all hoses and cables to the front of the Gas Selection Console except the Fiber Optic cable which will be covered
a little later. Avoid turning any fittings already mounted in the unit by placing a wrench on it before tightening the hose
fitting to it.
NOTE!
Argon must be used for the "Marking" gas. If replacing existing fittings in the base, apply thread sealant
to the fitting threads, according to manufacturer's instructions. Do not use Teflon tape as a thread sealer,
as small particles of the tape may break off and block the small air passages in the torch.
Manual PN: 0560956430
Art # A-09141_AB
INSTALLATION
100i / 200i / 300i / 400i
Art # A-09140
53

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

200i300i400i

Table of Contents