Reference Manual
00809-0100-4100, Rev AA
In normal operation the two block
valves between the process and
instrument ports will be open and the
equalizing valve will be closed.
1.
2.
3.
4.
Installation
To zero the 3051, close the
block valve to the low
pressure (downstream) side
of the transmitter first.
Open the center (equalize)
valve to equalize the pressure
on both sides of the
transmitter. The manifold
valves are now in the proper
configuration for zeroing the
transmitter.
After zeroing the transmitter,
close the equalizing valve.
Open the block valve on the
low pressure side of the
transmitter to return the
transmitter to service.
Section 3: Installation
H
Drain/
Vent
Valve
Equalize
(closed)
Isolate
(open)
Process
H
Drain/
Vent
Valve
Equalize
(closed)
Isolate
(open)
Process
H
Drain/
Vent
Valve
Equalize
(open)
Isolate
(open)
Process
H
Drain/
Vent
Valve
Equalize
(closed)
Isolate
(open)
Process
H
Drain/
Vent
Valve
Equalize
(closed)
Isolate
(open)
Process
June 2012
L
Drain/
Vent
Valve
Isolate
(open)
L
Drain/
Vent
Valve
Isolate
(closed)
L
Drain/
Vent
Valve
Isolate
(closed)
L
Drain/
Vent
Valve
Isolate
(closed)
L
Drain/
Vent
Valve
Isolate
(open)
41