Install A Hot-Swap Power Supply - Lenovo thinksystem SR630 Maintenance Manual

Hide thumbs Also See for thinksystem SR630:
Table of Contents

Advertisement

Figure 116. Hot-swap power supply removal
After removing the power supply:
1. Install a new power supply or install the power-supply filler to cover the power supply bay. See "Install a
hot-swap power supply" on page 118.
Important: To ensure proper cooling during normal server operation, both of the power supply bays
must be occupied. This means that each bay must have a power supply installed; or one has a power
supply installed and the other has a power supply filler installed.
2. If you are instructed to return the old hot-swap power supply, follow all packaging instructions and use
any packaging materials that are provided.

Install a hot-swap power supply

Use this information to install a hot-swap power supply.
The following tips describe the type of power supply that the server supports and other information that you
must consider when you install a power supply:
• The standard shipping has only one power supply installed in the server. For redundancy and hot-swap
support, you must install an additional hot-swap power supply. Certain customized models might be
shipped with two power supplies installed.
• Ensure that the devices that you are installing are supported. For a list of supported optional devices for
the server, see
http://www.lenovo.com/serverproven/
Notes:
• Ensure that the two power supplies installed on the server have the same wattage.
118
ThinkSystem SR630 Maintenance Manual

Advertisement

Table of Contents
loading

Table of Contents