Removing Cables - Cisco RFGW-10 Hardware Installation Manual

Rf gateway 10
Hide thumbs Also See for RFGW-10:
Table of Contents

Advertisement

Chapter 6
Cabling the Cisco RFGW-10 UEQAM
Figure 6-13
Note
The cables fit loosely in the holes, and are not locked into place until the lock bar is closed (Step 6).
Step 5
Repeat Step 3 and Step 4 for the remaining cables you are installing.
Note
Make sure the cables are aligned correctly and inserted completely otherwise the slide bar will not close.
Step 6
Slide the lock bar close completely, and use the T-10 TORX driver tool to tighten the screws clockwise
(torque 10 in-lbs, 1.13 Newton meters [Nm]). The locking bar is completely closed when they are
interlocked with the metal by the lead screw.
Note
The clamp bar maximum torque is 15 in-lbs (1.69 Nm).

Removing Cables

To remove the old cables, complete the following steps:
Step 1
Use the T-10 TORX driver tool to loosen the UCH2 lock bar on the side you want to remove a cable.
(See
Step 2
Slide open the lock bar by hand, or with a flathead screw driver, if the bar is tight or hard to access. (See
Figure
Step 3
Carefully pull the cable completely out of the UCH2.
Caution
Be careful not to bend the cables at right angles.
OL-16264-04
Placing Cables in the UCH2
Figure
6-9.)
6-10.)
Installing or Replacing the Cables in the UCH2
Cisco RF Gateway 10 Hardware Installation Guide
6-13

Advertisement

Table of Contents
loading

Table of Contents