Connecting Dual Power Shelves - Cisco RFGW-10 Hardware Installation Manual

Rf gateway 10
Hide thumbs Also See for RFGW-10:
Table of Contents

Advertisement

Connecting the Lineage Power Shelf to the Cisco RFGW-10
1
2
3

Connecting Dual Power Shelves

Required Tools and Equipment
Note
It is recommend that you use the straight DC power cables provided in the Lineage accessory kit. If you
are using a 4 AWG cable, use a high-flex high strand count power cable for optimal routing of the cables
under the front cover of the Cisco RFGW-10. The 2 AWG wire is not supported on the
RFGW-10-PWR-DC1= DC PEM module.
Steps
Caution
Do not connect the AC power cables to the facility power sources until the DC power cables are
connected to the power shelf, and to the Cisco RFGW-10.
Step 1
Connect the cables to the two Lineage power shelves, see
page
Step 2
Connect the DC "straight" power cables to the DC-input terminals on the on the Cisco RFGW-10
UEQAM. For information on connecting the cables, see
Step 3
Connect the AC power cables to a standard wall socket (facility power source) to provide power to the
Cisco RFGW-10 UEQAM. See
Figure 3-23
Cisco RF Gateway 10 Hardware Installation Guide
3-32
Lineage 1 RU power shelf
Black Y-Shaped DC power cables from power
shelf to RTN terminals DC PEM modules
Red Y-Shaped DC power cables from power
shelf to –48 V terminals on DC PEM modules
DC PEM module (RFGW-10-PWR-DC1=)
Two Lineage AC-DC power shelves
Eight straight DC power cables (Elmech), provided in the Lineage accessory kit
Flat-screw driver
10 mm hex socket driver
3-29.
shows two Lineage power shelves connected to the DC PEM modules.
4
Cisco RFGW-10 DC PEM 1
5
Earth ground cable
6
Cisco RFGW-10 DC PEM 0
"Cabling the Power Shelf" section on page 3-29.
"Powering On the Cisco RFGW-10 UEQAM" section on page
Chapter 3
Cisco RFGW-10 UEQAM Installation
"Cabling the Power Shelf" section on
3-28.
OL-16264-04

Advertisement

Table of Contents
loading

Table of Contents