Gear Box and Belt Replacement
8-G (9-5250)
This document reviews the process to replace the gear box and the drive belt in the 8-G stepmill.
Tools Required:
•
1/8" Allen Key
•
7/16" Socket
•
½" Socket
•
3/4" Socket
1.
Remove the four (4) rivets securing
the user left side shroud to the frame,
then remove the user left shroud.
NOTE: Be sure to remove the white
plastic fastener from the inside of the
shroud.
2.
Use a 7/16" socket to remove the
bracket securing the gear box to the
frame
Doc. #637-4490
Page 27