Installation Of Ceramic Top; Plumbing System Connection - MCZ Polar Installation And Use Manual

Table of Contents

Advertisement

3.3.5.

Installation of ceramic top

Install the top by setting it on the four upper protuberances of the
stove. The part underneath is provided with four small cavities at the
rubber supports indicated in
3.4.

PLUMBING SYSTEM CONNECTION

IMPORTANT!
The connection of the stove to the plumbing system
must be made ONLY by specialized personnel who
are capable of carrying out installation properly, in
compliance with current standards in the country of
installation.
MCZ will not be held responsible for damage to
persons or things in the event of failed operation if
the aforementioned warning is not complied with.
Connect the stove using the connections provided in the lower rear part
of the unit
CONNECTION DIAGRAM FOR POLAR/NOVA STOVE WITHOUT KIT FOR PRODUCTION OF DOMESTIC
HOT WATER
Ø80
Ø48
192
275
CONNECTION DIAGRAM FOR POLAR/NOVA STOVE WITH KIT FOR PRODUCTION OF DOMESTIC HOT
WATER
Ø80
Ø48
192
275
Installation and assembly
PELLET STOVES
INSTALLATION AND USE MANUAL
figure 11.
D
E
A2
C
A1
122
D
E
C
B2 A2
75
97
65
A1
B1
A1=Heating water delivery 3/4"M
A2=Heating water return 3/4"M
C=Vent 3/4"M
140
D=Refill 3/8"M
E= System empting and discharge 3/4"M
140
255
140
140
192
Technical service - Rights reserved MCZ S.p.A. - Reproduction prohibited
Chapter 3
page
Figure 11 – Supports for installation of
ceramic top
A1=Heating water delivery 3/4"M
A2=Heating water return 3/4"M
B1=Domestic hotwater outlet 1/2"M
B2=Domestic hotwater inlet 1/2"M
C=Vent 3/4"M
D=Refill 3/8"M
E= System empting and discharge 3/4"M
26

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Athos power hydroNova

Table of Contents