Plumbing Connection - MCZ Polar Installation And Use Manual

Table of Contents

Advertisement

2.10. PLUMBING CONNECTION

IMPORTANT!
The connection of the stove to the plumbing system
must be carried out ONLY by specialized personnel
who are capable of carrying out installation properly,
in compliance with current standards in the country
of installation.
If installation of the stove will involve interaction
with another, pre-existing system complete with
heating equipment (gas boiler, methane boiler, fuel
oil boiler, etc.), it is even more advisable to call in
qualified
personnel,
responsible for conformity of the system with current
applicable law.
MCZ will not be held responsible for damage to
persons or things in the event of failed or incorrect
operation if the aforementioned warnings are not
complied with.
For connection of the plumbing system to the stove, the user should
refer to chapter 3, INSTALLATION AND ASSEMBLY; specifically,
paragraph 3.4, CONNECTION TO PLUMBING SYSTEM
Theoretical notions for installation
PELLET STOVES
INSTALLATION AND USE MANUAL
who
subsequently
will
be
Technical service - Rights reserved MCZ S.p.A. - Reproduction prohibited
Chapter 2
18
page

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Athos power hydroNova

Table of Contents