Example Of Programming - MCZ Polar Installation And Use Manual

Table of Contents

Advertisement

This is the second of four available programmes. The methods of
setting are the same as those for the previously described programme.
Symbol on display
(8)
Data to be inserted
Schedule
Lighting the
This is the third of four available programmes. The methods of setting
are the same as those for PROGRAMME 1.
Symbol on display
(8)
Data to be inserted
Schedule
Lighting the
This is the last of four available programmes. The methods of setting
are the same as those for PROGRAMME 1.
TO EXIT THE PROGRAMMING SEQUENCE, YOU WILL ONCE
AGAIN NEED TO PRESS BUTTON 3 AFTER YOU COME TO STEP
"UT 16".
IMPORTANT NOTE
The stove requires about 20 minutes before sufficiently warm
air comes out, and another 10 minutes before it is up to full
power. Take this into account when setting the start time.
Likewise, stove shutdown requires about 30 minutes, during
which the heat stored up by the stove is released into the
room. Keep this in mind for substantial fuel savings.

4.11. EXAMPLE OF PROGRAMMING

Here is a complete example of programming. It refers to a weekly
heating cycle in a home which is always inhabited, with the residents
coming home at lunchtime and in the late afternoon.
On weekdays, heating is desired first thing in the morning, during the
lunch break, and upon returning home from work. On weekends,
heating is to be in operation at all times.
Operation
INSTALLATION AND USE MANUAL
PROGRAMME 3
UT 11
UT 12
Schedule
Shutdown
stove
PROGRAMME 4
UT 14
UT 15
Schedule
Shutdown
stove
PELLET STOVES
UT 13
Days activated or
deactivated
On/Off 1,2,3,4,5,6,7
UT 16
Days activated or
deactivated
On/Off 1,2,3,4,5,6,7
Technical service - Rights reserved MCZ S.p.A. - Reproduction prohibited
Chapter 4
47
page

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Athos power hydroNova

Table of Contents