INSTALLATION OF CERAMIC CLADDING FOR
POLAR AND NOVA
3.3.1.

Installation of upper panel

Remove the two pre-installed nuts in the upper part of the frame. Take
the upper panel, open the hinge and install it, using the two screws
welded onto the frame, which you freed when you removed the nuts.
Check the alignment of the panel and tighten the nuts
3.3.2.

Installation of lower panel

Remove the two pre-installed nuts in the lower part of the frame
alongside the ash compartment door. Take the lower panel, open the
hinge and install it, using the two screws welded onto the frame, which
you freed when you removed the nuts. Check the alignment of the
panel and tighten the nuts.
3.3.3.

Installation of side tiles

INSTALLATION OF THE TILES MUST ALWAYS START
FROM THE BOTTOM.
1. Turn the screw K so that the rod H comes into contact with the
Figure 5 - phase 1
structure.
2. Insert the tile first from the side of the rod H, and then insert
the opposite part in the housing in the fixed hooks G.
phase 1
3. Turn the tile towards the exterior of the stove so that the front
edge that remains free rests on the upright.
4. Repeat steps 1-2-3 for all the tiles of the side.
5. Turn the screw K so that the connected rod H pushes the tile
towards the upright. Use another wrench to tighten nut L to
permanently secure the system.
6. Repeat the operations described on the other side.
G
H
Figure 6 – Top view of fastening system of
the lateral ceramics
Installation and assembly
PELLET STOVES
INSTALLATION AND USE MANUAL
Figure 4
Figure 6 - phase 4
Figure 3
Figure 3 – Installation of upper front panel
Figure 4 – Installation of lower front panel
Figure 6 -
Figure 6 - phase 2
Figure 6 - phase 3
Technical service - Rights reserved MCZ S.p.A. - Reproduction prohibited
Chapter 3
page
K
L
H
Figure 5 – Side view of the fastening system
of the lateral ceramics
Legend for Figures 5 and 6
G - Rear fixed hooks
H - Front blocking rod
L - Blocking nut