Pre-Lighting Check; Loading The Pellets; Control Panel; Installation And Use Manual Page - MCZ Polar Installation And Use Manual

Table of Contents

Advertisement

4.2.

PRE-LIGHTING CHECK

Check that all the safety conditions described above have been met.
Make sure you have read and completely understood the contents of
this instruction booklet.
Remove all components from the firebox of the stove
and from the door. They may catch fire otherwise. This
includes the instruction booklet and various stickers.
Check that the grate for pellet combustion is correctly positioned, rests
properly on the base, and that it has not moved during handling of the
product.
Check that the electrical connection is correct (230 V 50 Hz), and turn
on the main switch located on the rear panel of the stove.
Check that on the control panel the display is lit up with the message
OFF / "CURRENT TIME".
4.3.

LOADING THE PELLETS

Fuel is loaded from the upper part of the stove by opening a door. Pour
the pellets in the hopper. When empty, it will hold about two 15-kg
sacks.
This is easier if performed in two steps:
Pour half of the contents into the hopper and wait for the fuel
to settle on the bottom.
Then pour in the rest
Never remove the protective grille from inside the
hopper. When loading pellets, keep the bag from
coming into contact with hot surfaces.
4.4.

CONTROL PANEL

INDEX OF BUTTONS AND INDICATOR LIGHTS
BUTTONS
1. Decrease set temperature / programming functions
2. Increase set temperature / programming functions
3. Scrolling of programming menu to increase/variation of speed
ventilation to increase
4. Scrolling of programming menu to decrease/diagnostics of smoke fan
ventilation to decrease
5. Stove lighting / shutdown
6. Set temperature of air and water thermostats / access programming menus
INDICATOR LIGHTS
7. General alarm (see specification)
8. Display D1-D2
9. Timer active/inactive indicator light
10. Indicator light that indicates when the thermostat calls for power
11. Water pump active/inactive indicator light
12. Heating system active indicator light
13. Domestic water system active indicator light
14. Heat exchanger in operation indicator light
15. Feed screw active/ inactive indicator light
16. NOT ACTIVE
17. Ignition plug in operation indicator light
Operation
PELLET STOVES
INSTALLATION AND USE MANUAL
2
!
SET
1
6
Technical service - Rights reserved MCZ S.p.A. - Reproduction prohibited
Chapter 4
34
page
3
5
4
TURBO

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Athos power hydroNova

Table of Contents