Manufacturing menu

This menu allows the user to start the manufacturing process (layering and sintering), and also to see the progress . It
consists of four parts .
Consult the section "Start a manufacturing process" on page 54 for details on basic rules of starting a job .
1
Manufacturing project
The current manufacturing file name,
The layer number already calculated,
The final layer of the project.
2
Progress area
Manufacturing progress in %, and total manu-
facturing time already completed,
The number and the layering time of the cur-
rent layering, and the total layering time,
The number and the sintering time of the cur-
rent sintering, and the total sintering time .
3
Launching area
Selection of the Start/End cycles:
Start of cycle
: if selected, executes actions of the
End of cycle
: if selected, executes actions of the
Selection of the Layering/Sintering process:
Sintering
: if selected, enables the sintering process, when starting a job .
Layering
: if selected, enables layering, when starting a job .
Selection of the layers:
Layer "_start_" to "_end_"
field to complete individually them (a numeric keypad will be displayed).
Optional: the button
when producing the first layers step-by-step). The button
fills the
_end_
layer with the
The button
"Aiming"
The button
allows to start the job (according to the selections
When activated, the confirmation window appears :
Validate
Click on
to launch the building process, on
to cancel .
Delay start function
The delay start function offers the possibility to start the selected cycles at a specific time. If selected, the user can program
the next start within the setting window:
Click on
Validate
to confirm, or on
3D SYSTEMS, INC.
: the numbers of the first and last layer must be indicated. Click on the corresponding
"+1"
_start_
increases the
Maximum layer
sets the laser in no-power mode : the laser will sinter (without power) with a red beam .
Quit
to cancel .
1
2
3
Start cycle
sequence (i .e gas ON . . .), when starting a job .
End cycle
sequence (i .e Blower OFF . . .), when staring a job .
layer by one and duplicate this value for the
" ...]"
increases the
value .
Start/End
Delay
to use the delay start function, or
42
_end_
_start_
layer by one, and automatically
cycles and
Layering/Sintering
Quit
PN:80-D48 REV A
4
layer (useful
process) .