ABB ControlMaster CM10 User Manual page 94

Universal process controllers
Hide thumbs Also See for ControlMaster CM10:
Table of Contents

Advertisement

ControlMaster CM10, CM30 and CM50
Universal process controllers,
...Functions / ...Bank Control
Bank Size
Control Source
Stage 1 (6)
Off Trip
On Trip
Output
Schedule
92
1
1
1
/
,
/
and
/
DIN
8
4
2
Select the number of stages (pumps) required for the application from 2 to 6 or Off.
Off disables the Bank Control functionality.
Select the analog signal that will act as the control signal for the bank control.
This is normally the Process Variable (PV) for most pump control applications.
Select the Control Source value (PV) at which the output (pump) will be turned off.
Select the Control Source value (PV) at which the output (pump) will be turned on.
Select the initial output (relay or digital output) that the output is assigned to by
default (for example, when FIFO or Rotate mode is not in operation.
Select the wear levelling schedule required:
Off – the output is not controlled by the bank schedule.
The state of the output is entirely controlled by its associated trip points.
FIFO – the output is controlled according to the FIFO schedule mode.
Rotate – the output is controlled according to the Rotate schedule mode.
7 Advanced Level
IM/CM/S–EN Rev. R

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Controlmaster cm30Controlmaster cm50

Table of Contents